All posts

Engineering

The review that ran for 46 hours

·2 min read

I wanted two controls on a command-line tool. One picked a version. The other let a project opt out of scheduled updates. My first draft added 179 lines across seven files. I handed it to five reviewers.

What the reviewers saw

Each reviewer read the whole change. Workers made repairs, and the next group reviewed the original work and the repairs. I had asked for two consecutive passes with no findings. Every new fix gave the next five reviewers something else to question.

Original change

179 added lines · 7 files

Force-stopped branch

37,451 added lines · 350 files

39full review passes

~46 hbefore I stopped it

0 / 2clean-pass counter

The process multiplied the added lines by about 209 and still could not satisfy its stopping rule.

Where I drew the line

After 39 passes I stopped the run. I went back to the original request. The change I kept added 217 lines across seven files. The extra work had made it harder to answer the only question that mattered to the people using the tool. Did those two controls work?

I now give the verification pass a narrower job. Check the accepted findings and the repairs. If a reviewer discovers a separate piece of work, I can decide whether to take it on separately.

Read the full incident record ↗